What Are The Requirements For The Installation Of Oil And Gas Well Head Devices? 

1. Selection and pressure test of wellhead equipment. The wellhead device should be determined according to the high construction pressure of the fracturing acidification design, that is to say, the nominal pressure of the selected wellhead device must be greater than or equal to the high pressure of the construction design. The wellhead device must be tested as a whole before being installed, and the well can be used only after it is qualified. For oil wells, test the pressure according to the water-tight pressure test standard; for gas wells, test the pressure according to the air-tight pressure test standard. Casing pup joints, bottom flanges, and casing spools should be installed in sections, and the wellhead device should be installed to protect the casing thread and ensure the quality of the make-up. The installation of the above part of the four-way casing can be determined according to the construction requirements.

2. Inspection and installation of casing sub-sections of wellhead equipment. The material and specifications of the casing sub-sections at the corner of the well should be consistent with the casing connected in the well. The annealed parts should be cut off to ensure the strength of the casing sub-sections. . The new buckle of the wellhead installation should be smooth and free of burrs, and pass the pressure test (the pressure test standard is 80% of the original manufacturer’s pressure test pressure value. Tighten it by hand at the wellhead. There should be 3—3.5 buckle fingers 8 buckles per inch. If there is too much or too little buckle, it can’t be used.

The steel ring of the wellhead device is made of low-carbon steel material, which is relatively soft and should be prevented from being damaged. When installing the wellhead device, pay attention to check the steel ring and the steel ring groove. There should be no damage, no rust, no mud, and scrub clean. When tightening the flange bolts, the corners should be tightened, and the flanges should be tightened flat. After installation, the four corners of the wellhead device should be balanced and tightly tightened with a wire rope. Selection and pressure test of wellhead equipment. Inspection and installation of casing pup joints. Installation of wellhead equipment.

The label

0

Recent browse:

Related products

Related news

Jiangsu Xinde Petroleum Machinery Co., Ltd.

Integrity, Respect, Dedication, Gratitude

Mail:sales@xinde.com.cn

Address: No. 88, Xingdang Road, Jianhu County, Yancheng City, Jiangsu Province, China

Disclaimer: Some of the content pictures on this site are from the Internet, if there is any infringement,
please contact the administrator to delete it in time, thank you!

苏ICP备2021051246号-1 Copyright ©Jiangsu Xinde Petroleum Machinery Co., Ltd.

SUPPORT HOTLINE

0515-69900566

0515-68783701

0515-68783558