产品中心banner

Xinjiang Zhaosheng Drilling Co., Ltd.

Mainly engaged in oil drilling, oil testing, workover operations, technical services for corresponding projects, and top drive, blowout preventer, and drilling tool rental services.


Xinjiang Zhaosheng Drilling Co., Ltd. is a wholly-owned company. Mainly engaged in oil drilling, oil testing, workover operations, technical services for corresponding projects, and top drive, blowout preventer, and drilling tool leasing services. The company was established on May 22, 2012 with a registered capital of 80 million yuan. It settled in the Korla Economic and Technological Development Zone. The project invested 1.118 billion yuan. It has 2000 square meters of office space and nearly 1,000 employees. A group of 200 drilling experts and technical backbone personnel, accounting for 20% of the total number of employees, have accumulated rich experience in deep well and ultra-deep well drilling engineering projects. The company has 15 all-electric drilling rigs in use, including 1 5000-meter drilling rig, 1 7000-meter drilling rig, 6 8000-meter drilling rigs, and 7 9000-meter drilling rigs. It is a large-scale private enterprise using all-electric drilling rigs in China. The annual output value is about 1 billion yuan. The company has obtained the "Safety Production License" of the Work Safety Supervision Administration, passed the QHSE management system certification, and obtained the "Market Access License" of the oilfield company. The company adheres to the purpose of dedicating energy and creating harmony, and carries forward the enterprise spirit of patriotism, innovation, truth-seeking and dedication. The company adopts advanced scientific and technological achievements, accelerates the digitalization and intelligentization of drilling safety production management, to forge ahead, overcome difficulties, and strive to be the vanguard of the drilling market. Follow the corporate philosophy that there are only desolate deserts and no desolate life. To achieve safety first, quality first, environmental protection first, and people-oriented, strive to win glory for the Tarim Oilfield and make new contributions to the development of China's petroleum industry. At present, the main service target in China is the Tarim Oilfield of PetroChina, which has been undertaking the drilling tasks of the difficult mountain piedmont wells in the oilfield. The company has contracted a total of 35 ultra-deep wells and high-difficulty wells over 6000 meters, all of which are drilling risk general contracting and drilling and completion general contracting. The cumulative footage has reached 23,2233.6m. The Keshen 903 well in the Tarim Oilfield completed in 2015 was the largest The well depth is 7641.2 meters; in 2016, the very difficult sub-salt horizontal well YD1-6H in the Tarim Oilfield was completed. Contract right; Bozi 104 well, optimized turbine + impregnated and imported non-planar tooth PDC bit. It took 381 days to complete and transfer to oil test, and the completion depth was 6930 meters, which was 71 days earlier than the designed drilling cycle. It is the subsequent Kelasu structure The drilling of deployment wells in Bozi 1 well area has laid a solid foundation. Well Bozi 3, which was completed in 2017, and Well Tubei 401, which was completed in 2018, both received the title of industrial oil and gas flow. The Dabei 9 and Bozi 102-2 wells of the Tarim Oilfield, which were completed in 2019, obtained industrial oil and gas flow; the Keshen 11-1 well, which was completed in 2019, was only among the high-density oil-based drilling fluids of 2.28-2.33g/cm³ It took 50 days to safely, quickly and efficiently drill through a huge 3382.8-meter thick salt paste layer, and successfully solved the technical problem of "narrow safety window and the same layer of spillage" in the salt layer of the Kumgle Group by using fine pressure control; Well 251H was completed at a depth of 8006m. It is a deeper horizontal well in Tarim, setting the record for a horizontal well in Tarim. In 2020, Bozi 2 well air drilling, domestic (φ311.2mm wellbore) gas drilling construction well depth, Tarim Oilfield gas drilling single-shot footage length, Tarim Oilfield gas drilling single well footage length and Bozi block gas drilling single trip Four records of footage length.


Contact information

Address::Second Line Living Area, Korla West Railway Station, Bazhou, Xinjiang

Telephone:0996-2688785


Organizational structure




Jiangsu Xinde Petroleum Machinery Co., Ltd.

Integrity, Respect, Dedication, Gratitude

Mail:sales@xinde.com.cn

Address: No. 88, Xingdang Road, Jianhu County, Yancheng City, Jiangsu Province, China

Disclaimer: Some of the content pictures on this site are from the Internet, if there is any infringement,
please contact the administrator to delete it in time, thank you!

苏ICP备2021051246号-1 Copyright ©Jiangsu Xinde Petroleum Machinery Co., Ltd.

SUPPORT HOTLINE

0515-69900566

0515-68783701

0515-68783558